MV UPS solutions.
Built around the data centre.

MV UPS solutions.
Built around the data centre.

Medium-voltage uninterruptible power supply (MV UPS) solutions for data centres and critical facilities. Coordinate power continuity, battery storage and distribution as one project scope.

See the whole power path.

Follow the grid, storage, distribution and facility interfaces. For data centres, coordinate the MV UPS solution across this power path before equipment choices become fixed.

Grid interfaceEnergy storagePower distributionFacility infrastructure

Put MV UPS at the centre of the power plan.

Start with the critical loads and their continuity requirements. Define the MV UPS architecture together with the medium-voltage distribution, power conversion, battery storage and backup supply interfaces.

Power quality and continuity

Define the disturbances to be assessed, operating modes and interactions with critical loads. Confirm performance requirements through project design and equipment validation.

Storage and backup coordination

Size the battery duty around the required support period and operating strategy. Coordinate the interfaces with standby generation, bypass arrangements and maintenance access.

Bring the facility interfaces together.

Power equipment, cooling, modular structures and service access need a shared layout. Coordinate the boundaries between electrical, mechanical, civil and equipment scopes before key selections are fixed.

Bring the facility interfaces together.

Make staged delivery practical.

Set out what each stage needs, how future stages connect and which interfaces must be prepared early. Define design reviews, equipment coordination and handover requirements with the project team.

From requirements to a defined project.

  1. Frame the requirement

    Share the site, demand profile, operating priorities and intended programme.

  2. Define the architecture

    Map the equipment scope, interfaces and decisions that need engineering input.

  3. Coordinate the delivery plan

    Align suppliers, documentation, production milestones and site requirements.

  4. Prepare for integration

    Agree acceptance evidence, installation interfaces and the handover scope.

Project development

Bring the next project into focus.

Start with the site, the demand and the delivery constraints. We can help frame the next decisions.